The expertise of Foundation Specialists, inc. in bridge retrofitting has been applied to several bridges around the country.
Pier 5 of Agana Bridge in Tarlac was retrofitted with two 2-meter diameter bored piles and a new coping beam. The above photo shows the original pier.
This photo shows the construction of the new coping beam after completion of the bored piles. The construction was done without interrupting traffic flow over the bridge.