Plaridel Bridge in Carmen Pangasinan was retrofitted with large-diameter bored piles and a new coping beam. During construction, the bridge was supported using I-beams resting on corbels temporarily constructed on the newly-constructed bored piles as shown in the left photo. After completing the coping beam, the corbels were removed. Throughout the duration of construction, the bridge was kept open to traffic.
Address
Plaridel
Bulacan
Philippines